Files
federated-calendar/.gitlab-ci.yml
T

67 lines
1.3 KiB
YAML

image: fedora:rawhide
stages:
- build
- test
- deploy
variables:
DEPENDENCIES: gcc meson ninja-build gettext gtk-doc glib2-devel
gtk3-devel gsettings-desktop-schemas-devel git
gnome-online-accounts-devel libdazzle-devel
evolution-data-server-devel libgweather-devel
geoclue2-devel
before_script:
- dnf update -y --nogpgcheck && dnf install -y --nogpgcheck $DEPENDENCIES
##
# Stage: Build
#
# Checks if GNOME Calendar is properly building and installing. This is the
# most important stage of the CI, and no MR should ever be merged if it breaks
# any of them.
##
build:
stage: build
script:
- meson . _build
- ninja -C _build
install:
stage: build
script:
- meson . _build
- ninja -C _build
- ninja -C _build install
##
# Stage: Test
#
# Runs the unit tests and makes sure the new changes does not reintroduce bugs
# or breaks something unrelated.
##
test:
stage: test
script:
- meson . _build
- ninja -C _build
- meson test -C _build --verbose --no-stdsplit
##
# Stage: Deploy
#
# Checks if the released version is perfectly functional.
##
deploy:
stage: deploy
script:
- meson . _build
- ninja -C _build
- meson test -C _build
- ninja dist -C _build
only:
- tags