Files
federated-calendar/src/gui
Victoria Lacroix b35212c88c gcal-application: Ctrl+R to synchronize calendars
In !332, there was some difficulty with having two accelerators for the
"Synchronize calendars" action, so the Ctrl+R accelerator was left out.

This commit adds the Ctrl+R accelerator to gcal-window.ui by specifying
it before the F5 accelerator. The result is that only F5 is shown as an
accelerator in the overlay menu, but Ctrl+R still works.

Ctrl+R was also added to help-overlay.ui, displayed alongside F5.

Fixes #1052
2023-08-06 11:08:35 -04:00
..
2023-08-03 11:26:19 +00:00
2023-06-17 22:13:41 +00:00
2022-06-22 12:49:38 +00:00
2022-02-11 09:18:38 -03:00
2022-02-11 09:18:38 -03:00
2023-06-19 22:48:02 +00:00
2022-02-11 09:18:38 -03:00