Commit Graph
98 Commits
Author SHA1 Message Date
Florian Brosch d51d1ea2cd view: Move weather API to interface GcalView
This allows us to get rid of similar code.
2017-12-11 22:09:59 -02:00
Florian Brosch 759e6ef0b1 week-header: Rename WeatherInfoPos to WeatherInfoDay and drop positions. 2017-12-11 21:38:08 -02:00
Florian Brosch 660e1c6178 Avoid single line comments. 2017-12-11 21:38:08 -02:00
Florian Brosch f0fa9eca70 week-header: Properly handle weather infos on date changes 2017-12-11 21:32:01 -02:00
Florian Brosch a188c68653 week-header: Style temperatures 2017-12-11 21:29:33 -02:00
Florian Brosch 30297f084d weather: week: Add space between icon and temperature 2017-12-11 21:29:33 -02:00
Florian Brosch 4ffbf68b23 week-header: Add initial weather support.
This is still work in progress. API is stable but presentation
is not. It also contains some LOCs for unfinished mouse-over and
click-events.
2017-12-11 21:23:20 -02:00
Georges Basile Stavracas Neto 53a8278953 views: correctly hide events according to the mod type
When deleting events with recurrence, we want to hide the event
widgets according to the modification type. So that selecting
e.g. subsequent in the modification type dialog hides the event,
and the subsequent ones, truly reflecting the operation that will
happen.

Currently, however, the views don't do that, and only hide the
event that was asked to be deleted.

Fix that by passing the object modification type, and adapting the
views to take that into account.
2017-09-07 00:02:40 -03:00
Georges Basile Stavracas Neto 3b6b536663 recurrence: add GcalRecurrenceModType
Instead of reusing the ECalObjModType and mixing the
prefixes all around, do this small cleanup and add a
gcal-prefixed enum.
2017-09-07 00:02:40 -03:00
Yash Singh 9ffa913ad4 manager: pass ECalObjModType to update and remove
Currently, GcalManager always assumes E_CAL_OBJ_MOD_THIS
when modifying or deleting events. Since we're landing
the groundwork for recurrence management, we can't assume
this anymore.

This patch, then, allows GcalManager:modify_event() and
:remove_event() receive the ECalObjModType instead of
assuming E_CAL_OBJ_MOD_THIS. However, this commit does
not add recurrence support yet, and every call to these
functions are still passing E_CAL_OBJ_MOD_THIS.

https://bugzilla.gnome.org/show_bug.cgi?id=782755
2017-05-27 11:36:05 -03:00
Georges Basile Stavracas Neto d294ea46a5 week-header: fix drawing stray lines when managing events 2017-05-24 17:27:07 -03:00
Georges Basile Stavracas Neto 09fe510937 views: use the new GcalClock to redraw
Instead of having each view manage it's own timeout (or
even worse, making GcalWindow manage it), use the newly
introduced GcalClock API to do that.
2017-05-16 14:57:15 -03:00
Mohammed Sadiq 4dde284170 week-header: fix memory leak
https://bugzilla.gnome.org/show_bug.cgi?id=782561
2017-05-15 17:23:31 -03:00
Orkun Tezer a54e91a9b3 week-header: use g_date_time_add_days for dnd date calculation
Dnd at week header crashes with segmentation fault

The problem, calculation of dnd_date returns NULL when week_start is
in previous month.

Fix that by using g_date_time_add_days() function

https://bugzilla.gnome.org/show_bug.cgi?id=781955
2017-05-08 21:49:46 -03:00
Kevin Lopez ec3ef0d0a3 search-view: hide if click is performed outside
Result drop down should disappear when any click is performed outside
that drop down.

https://bugzilla.gnome.org/show_bug.cgi?id=74796

https://bugzilla.gnome.org/show_bug.cgi?id=747962
2017-05-04 08:55:50 -03:00
Orkun Tezer a6e347d8f2 week-header: Move events at column after remove event from list
The Problem: When user remove 4rt fullday event, header only shows two
events and not shows 3rd fullday event

Because, we check and set visibility of event that user wants to remove
from calendar, before remove event from event list which causes 3rd
event unvisible.

Fix that with check and set visibility of event after remove event
from event list, then visibilties and overflow corretly calculated

https://bugzilla.gnome.org/show_bug.cgi?id=777423
2017-05-03 21:55:39 -03:00
Georges Basile Stavracas Neto 7dc5eb5bf5 week-grid, week-header: properly initialize datetimes
Since we use autoptr on those, we may end up falling in to
the early return and mistakenly unreferencing the not
initialized new date.
2017-04-29 12:57:06 -03:00
Georges Basile Stavracas Neto aa5b963412 view: rework active-date
The current implementation is deficient in many ways, the
worst one being the it relying on GObject semi-synchronous
property emission.

This issue was exposed by the Week view code, where the active
date was updated, but delayed to reach the Week header and some
events were being added ~before~ the active date changed.

With this work, I was also able to figure out a bunch of code
that relied on this (i.e. luck) to work.
2017-04-12 20:51:23 -03:00
Georges Basile Stavracas Neto 57a2bf8983 week-grid, week-header: simplify code
We don't need to check whether the end date is NULL,
for GcalEvent always ensures that.
2017-04-12 15:12:03 -03:00
Georges Basile Stavracas Neto c2f3953dde week-header: don't attempt to add events incorrectly
One of the biggest issues of GNOME Calendar views right now
is that they rely on GObject property system to update the
active date. Even gcal_view_set_date() is just a wrapper
around GObject set.

Because GObject asynchronously updates the property by letting
the mainloop handle it, we can never be assured that all the
views had their views updated before updating the data model.

This patch temporarily adds sanity checks to GcalWeekHeader
to prevent making Calendar unusable, until we fix GcalView.
2017-03-24 22:21:24 -03:00
Jente Hidskes de2578ac54 views: use ACTION_MOVE to display correct cursor
When dragging events around, the cursors show a + as opposed to a
an arrow indicating that the event is being moved. This can confuse
users.

The fix is to tell GTK that the drag being performed is a move.

https://bugzilla.gnome.org/show_bug.cgi?id=774922
2017-03-22 22:55:50 -03:00
Georges Basile Stavracas Neto 82aa5fadb0 week-header: correctly check for updatable events
When comparing events' dates against week dates, we must
be careful to compare UTC with UTC. Otherwise, some events
will be left, specially at the first and last days.
2017-03-17 21:09:33 -03:00
Georges Basile Stavracas Neto f1b59d64d2 week-header: fix dnd at first column 2017-03-17 16:38:59 -03:00
Georges Basile Stavracas Neto 8b718ee0a0 week-view, week-header: instrument more functions 2017-03-17 16:38:28 -03:00
Georges Basile Stavracas Neto 002271ebb1 views: get rid of current date
We can easily track the current date with GDateTime API,
so we don't actually need the current date field.
2017-03-17 15:49:12 -03:00
Georges Basile Stavracas Neto 339b49e7d5 views: cleanup code 2017-03-17 11:13:19 -03:00
Georges Basile Stavracas Neto d5825bbd35 project: override log domains
This way, we can have more useful debug spils.
2017-03-17 10:14:25 -03:00
Joyjit Choudhury 35b2f90cab week-view: set correct week number
In this commit, the correct week number is set in week-view.

The problem is, the week number of week-view is being set according to
the first day of the week (if the first and last day of the week
are in the same year), or the first and last day of the week
(if the first and last day are in different years).

To fix this, the week number is being set according to the middle day
of the week (according to ISO 8601 standards), resulting in correct
week numbers.

https://bugzilla.gnome.org/show_bug.cgi?id=779331
2017-03-16 20:31:37 -03:00
Georges Basile Stavracas Neto 0266202d40 week-header: continue fixing event positions 2017-03-15 09:50:51 -03:00
Georges Basile Stavracas Neto 669869cf3f week-header: fix calc of events' start and end positions
Another shot in this issue. Again.

https://bugzilla.gnome.org/show_bug.cgi?id=780051
2017-03-15 17:45:49 +05:30
Georges Basile Stavracas Neto f608f8fd9d week-header: don't account first weekday twice
The auxiliary functions to calculate the week start
already takes the first weekday into account. We,
however, were considering it again when calculating
the event position.

Fix that by only considering it once, through the
get_start_of_week() function.

https://bugzilla.gnome.org/show_bug.cgi?id=780051
2017-03-14 20:27:32 -03:00
Georges Basile Stavracas Neto 0dcf86b7c2 week-header: improve drag and drop
The rudimentary drag n' drop support should also deal
with the following corner cases:

           All Day
Multiday |   TRUE   |   FALSE    |
         |----------|------------|
    TRUE |   utc    | no changes |
   FALSE |   utc    |    utc     |

https://bugzilla.gnome.org/show_bug.cgi?id=777424
2017-03-14 20:19:28 -03:00
Georges Basile Stavracas Neto 97698ad1c9 week-header: use a proper function to queue redraw
We were using gtk_widget_queue_draw() as a callback to
a GTimeoutSource, which expects a boolean return type.
This is clearly wrong, and has the chance to cause
a segmentation fault.

Fix that by passing a function with the apropriate signature.

https://bugzilla.gnome.org/show_bug.cgi?id=779823
2017-03-10 08:00:39 -03:00
Georges Basile Stavracas Neto 31aa709487 week-header: fix placement of events
When the first weekday wasn't monday, we were
miscalculating the initial and final positions
of the widgets.

Fix that by properly calculating the initial and
final positions.
2017-03-05 20:32:33 -03:00
Georges Basile Stavracas Neto e69c9aa09c week-header: fix untranslated strings 2017-02-27 08:46:52 -03:00
Georges Basile Stavracas Neto ce52cdd9ce week-header: fix double dnd highlight 2017-02-14 18:00:05 -02:00
Georges Basile Stavracas Neto 7a21e1e5ac week-header: implement drag n' drop 2017-01-17 11:24:22 -02:00
Georges Basile Stavracas Neto 30cb8a5020 week-header: improve rendering of selection 2016-12-15 17:32:27 -02:00
Georges Basile Stavracas Neto f013d7442e week-header: fix event margins 2016-12-15 17:09:45 -02:00
Georges Basile Stavracas Neto 33f1e4cd31 week-header: minor improvements on date selection 2016-12-14 17:18:48 -02:00
Georges Basile Stavracas Neto ffaf7153d7 week-header: implement event creation 2016-12-14 17:00:11 -02:00
Georges Basile Stavracas Neto bcfe13bcbc week-view: adapt view and widgets to handle RTL 2016-12-08 20:33:34 -02:00
Georges Basile Stavracas Neto 6d4f719829 week-header, week-grid: update drawing when time changes
When minutes change, the week grid should update the today strip
if it's visible and, if the day change, week header should update
the blue week name.
2016-12-08 19:33:20 -02:00
Georges Basile Stavracas Neto c1ab1c2d3b week-header, week-grid: remove duplicate code 2016-12-08 18:53:34 -02:00
Georges Basile Stavracas Neto 36f716ebf4 week-view: reimplement editing events 2016-12-08 18:23:25 -02:00
Georges Basile Stavracas Neto 5238e6ff9d week-header: don't rearrange events if week didn't change 2016-12-08 17:50:30 -02:00
Georges Basile Stavracas Neto f98a465612 week-header: don't set a minimum content height 2016-12-08 16:40:00 -02:00
Georges Basile Stavracas Neto f7658bede2 week-header: fix various issues with dates
When breaking and merging event widgets, the start
and end dates must be updated to reflect the current
widget state.
2016-12-08 16:39:02 -02:00
Georges Basile Stavracas Neto e474ac1902 week-header: redraw the whole background on draw() 2016-12-08 16:21:08 -02:00
Georges Basile Stavracas Neto 6e3b4a5f04 week-header: don't leak overflow labels when expanded 2016-12-08 16:20:10 -02:00