Commit Graph
7 Commits
Author SHA1 Message Date
Georges Basile Stavracas Neto 132d4435f6 event-widget: Port to GTK4 2022-02-11 09:18:42 -03:00
Georges Basile Stavracas Neto 68160348dc Introduce GcalEventPopover
GcalEventPopover gives a preview of the event, and handy access
to the event description and information. It also allows easily
joining meetings if any one if available.

The list of supported meeting URLs is small now, but I hope
more people will contribute as we go.

It is also possible to edit the event through an edit button.
2021-06-27 18:45:12 -03:00
Georges Basile Stavracas Neto f052cb6589 event-widget: Remove idle on destroy
Finalize may be too late for us, since a widget
may be destroyed long before it's finalized.

Remove the idle timer on destroy then.
2020-04-01 21:06:51 -03:00
Georges Basile Stavracas Neto b772349c3f Move UI files to src/
Keep it in sync with what To Do and Settings do.
2019-12-02 16:41:56 -03:00
Michael Catanzaro 18ae67cb59 Use more g_signal_connect_object()
Most of these are probably paranoid, not bugs. I haven't done an
exhaustive review to see what really needs it: that would be
time-consuming and require significant familiarity with the Calendar
codebase. This was just a quick check. Anyway, I vote for paranoid
when it comes to using g_signal_connect() regardless. It's dangerous,
and there's no reason to ever leave a signal connected after the user
data object has been destroyed.

Fixes #423
2019-09-14 23:28:42 +00:00
Milan Crha a0cae4356a Port to libecal-2.0
Fixes https://gitlab.gnome.org/GNOME/gnome-calendar/merge_requests/70
2019-05-17 21:58:55 +02:00
Georges Basile Stavracas Neto f55b4531ef project: Move ui-related classes to gui/ 2019-05-04 12:14:05 -03:00