The current implementation is deficient in many ways, the
worst one being the it relying on GObject semi-synchronous
property emission.
This issue was exposed by the Week view code, where the active
date was updated, but delayed to reach the Week header and some
events were being added ~before~ the active date changed.
With this work, I was also able to figure out a bunch of code
that relied on this (i.e. luck) to work.
In month view and year view, when the mouse is hovering over
an event, nothing is shown. A tooltip with the event information
would be much more useful in this scenario.
Fix that by showing a tooltip displaying the event's title, time
and date, and, if present, the location and notes of the event. Long
notes are truncated and ellipsized.
https://bugzilla.gnome.org/show_bug.cgi?id=774952
On RTL languages, the calcs to detect the start and end
of the new event were wrong, leading to the weird behavior
it currently has.
Fix that by correctly calculating the start and end cells
on RTL languages.
https://bugzilla.gnome.org/show_bug.cgi?id=777429
Earlier Calendar showed an account as "on" even when the credentials had expired.
This patch fixes the issue and instead shows "Expired" label upon expiration of credentials.
https://bugzilla.gnome.org/show_bug.cgi?id=761766
The code in ECalDataModelSubscriber:component_changed() and
:component_removed() was actually duplicated, and we can
simplify the :component_changed() routine by simply removing
and readding the event.
The current Year view drawing routine gathers events
every single time we draw the navigator. This is, to
the best case, slow to death. In fact, this is why
year view's navigator is so memory and processor
consuming.
To fix that, cache the added components and simply
query them at drawing time.
One of the biggest issues of GNOME Calendar views right now
is that they rely on GObject property system to update the
active date. Even gcal_view_set_date() is just a wrapper
around GObject set.
Because GObject asynchronously updates the property by letting
the mainloop handle it, we can never be assured that all the
views had their views updated before updating the data model.
This patch temporarily adds sanity checks to GcalWeekHeader
to prevent making Calendar unusable, until we fix GcalView.
Earlier the height of event-widget with duration of 30 mins or less exceeded
the desired space in week-grid. As height available was not checked beforehand,
this resulted in some event-widgets getting height assigned which was more
than the height available.
This patch fixes the erroneous assignment of event-widget's height by first
comparing the required height with the available height. If the required
height exceeds the available height, then the display-text is given as a
single-line for the widget to fit properly.
https://bugzilla.gnome.org/show_bug.cgi?id=778070
As the assignment of display-text, and in turn that of event-widget's height,
is taken care of in event-widget, we no longer need to consider natural-
height, while assigning height in week-grid.
This patch fixes this issue by removing natural-height, and directly
assigning the desired value to height.
https://bugzilla.gnome.org/show_bug.cgi?id=778070
When dragging events around, the cursors show a + as opposed to a
an arrow indicating that the event is being moved. This can confuse
users.
The fix is to tell GTK that the drag being performed is a move.
https://bugzilla.gnome.org/show_bug.cgi?id=774922
When comparing events' dates against week dates, we must
be careful to compare UTC with UTC. Otherwise, some events
will be left, specially at the first and last days.
This is a big cleanup commit where I tried my best to
make GcalManager code more structured and readable. This
included both cosmetic and functional changes.
In this commit, the correct week number is set in week-view.
The problem is, the week number of week-view is being set according to
the first day of the week (if the first and last day of the week
are in the same year), or the first and last day of the week
(if the first and last day are in different years).
To fix this, the week number is being set according to the middle day
of the week (according to ISO 8601 standards), resulting in correct
week numbers.
https://bugzilla.gnome.org/show_bug.cgi?id=779331
There are some weird cases around the globe where the timezone
changes in the middle of the day. In GMT-8:00, for example, the
DST changes at 2:00 am. This makes the timezone of thestart of
the week different from the event's timezone, and somehow the
GLib API doesn't take that into account when calculating the
diff between two dates.
Fix that by also considering different timezones when calculating
the event start and end positions.
https://bugzilla.gnome.org/show_bug.cgi?id=780079
Sometimes, we'll need to ignore the reported minimum sizes
to be able to set the width of events to an acceptable
size. This is the case of the week grid.
https://bugzilla.gnome.org/show_bug.cgi?id=780052
The auxiliary functions to calculate the week start
already takes the first weekday into account. We,
however, were considering it again when calculating
the event position.
Fix that by only considering it once, through the
get_start_of_week() function.
https://bugzilla.gnome.org/show_bug.cgi?id=780051
The rudimentary drag n' drop support should also deal
with the following corner cases:
All Day
Multiday | TRUE | FALSE |
|----------|------------|
TRUE | utc | no changes |
FALSE | utc | utc |
https://bugzilla.gnome.org/show_bug.cgi?id=777424