calendar-monitor: Don't replace new events
If an event is already present in the cache, don't attempt to insert it, which replaces the available event instance with the new one.
This commit is contained in:
@@ -1046,8 +1046,11 @@ add_events_to_timeline_in_idle_cb (gpointer user_data)
|
||||
event = g_ptr_array_index (events, i);
|
||||
uid = gcal_event_get_uid (event);
|
||||
|
||||
if (g_hash_table_insert (self->shared.events, g_strdup (uid), g_object_ref (event)))
|
||||
g_signal_emit (self, signals[EVENT_ADDED], 0, event);
|
||||
if (!g_hash_table_contains (self->shared.events, uid))
|
||||
{
|
||||
g_hash_table_insert (self->shared.events, g_strdup (uid), g_object_ref (event));
|
||||
g_signal_emit (self, signals[EVENT_ADDED], 0, event);
|
||||
}
|
||||
}
|
||||
|
||||
GCAL_RETURN (G_SOURCE_REMOVE);
|
||||
|
||||
Reference in New Issue
Block a user